watt-resolve

Filings → sponsors → decision-makers

Pre-RFP origination

See the project and the decision-maker before the RFP.

Public filings resolve to real sponsors and stage. Conference speakers map to those projects. Outreach is timed to the event — not the bid desk.

Walkthrough

6 steps · project → resolve → speakers → join → sequences · P start · L new filing

GW tracked

2.95

corridor queue

Median lead (d)

128

pre-RFP window

Signals (24h)

14

Entities resolved

6

Speakers scored

6

Project Alpha

Wilbarger County, TX

97Priority open

Cross-source trail

No single live source of truth — disconnected systems, one entity.

Filing name

Alpha Power Holdings LLC

Resolved project

AWS-backed gas-to-power + CCS campus (N. Texas)

Stage inference

FEED · 82% conf

ERCOT study phase + TCEQ NSR in review + Ch. 312 abatement filed — design fluid, no public RFP yet.

Lead time

142d

vs typical RFP

Capex (est.)

$2.4B

Wilbarger County, TX

Demand drivers

AWS data center cluster
AI load growth
Behind-the-meter microgrid

Amazon / Go Build signal

Go Build / Climate Pledge demand signal for low-carbon materials + power island

Public filings timeline

ERCOT · TCEQ · County courts · Federal incentives · Stage appearances · 5 records

  1. Federal45Q-TX-NORTH-092026-06-02

    45Q pathway memo referenced in public comment docket

    Counsel notes sequestration offtake LOI under review. Capital stack assumes 45Q + 48E stack.

    DOE OCED / IRS Form 8933 prep

  2. CountyCC-2026-0519-072026-05-19

    Chapter 312 tax abatement application

    10-year abatement for 'industrial power generation campus.' Appraiser exhibits show dual-use industrial + fiber corridor parcels.

    Wilbarger County Commissioners Court

  3. TCEQNSR-184222026-04-28

    NSR air permit application — combustion turbines + HRSG

    4× F-class turbines, SCR/CO catalyst, CCS tie-in language in BACT analysis. Backup diesel genset bank for data hall UPS.

    TCEQ Region 3

  4. StageDCW-26-KEY-042026-04-08

    Data Center World — AWS power reliability panel

    VP Engineering (Power) discussed 'Texas gas-to-power islands with carbon capture for AI clusters' — no site named.

    Data Center World, Austin

  5. ERCOTGINR-26-44182026-03-12

    GINR interconnection request — Alpha Power Holdings LLC

    980 MW gas + 200 MW BESS at POI near Oklaunion. COD target Q2 2029. Confidential offtaker flag set.

    ERCOT RIOO